Data · verified fleet registry

Everyone claims scale. Few disclose it.

There is no canonical list of how many GPUs each AI cloud runs. SemiAnalysis scores fleet size behind a paywall; providers disclose only when it suits them. This census assembles the public record — deployed, ordered and planned silicon per provider — from filings, earnings, newsrooms and government announcements. Every figure carries a date and a source.

All figures verified as of 2 August 2026 · by Rahul Patwardhan · send a correction

Before the numbers

How to read this census

A GPU count is only meaningful with its class and its date. Providers blend three kinds of numbers in their marketing, and the differences decide real capacity. Equally important is whose GPUs they are: some of the largest "clouds" below operate chips that belong to their customers.

Class 1

Deployed

Racked, networked and revenue-ready. The only number a buyer can actually consume this quarter. CoreWeave's 250,000 (Dec 2024) and Yotta's 16,384 H100s are deployed figures.

Class 2

Ordered / contracted

A signed purchase order or lease with a delivery window — real money, not yet compute. IREN's 50,000+ B300s (delivering H2 2026) and Nscale's ~200,000 GB300s for Microsoft sit here.

Class 3

Planned

An announced target with no confirmed hardware behind it. Lambda's "1M GPUs and 3 GW" ambition, Neysa's 20,000-GPU plan, TensorWave's 2 GW of secured capacity. Ambition, not capacity.

The ownership trap

Crusoe's Abilene campus runs Oracle's and OpenAI's GB200 racks; Fluidstack operates clusters owned by Anthropic (largely Google TPUs) and is building a 1 GW French site whose anchor customer is Mistral. Counting those chips as "Crusoe's fleet" or "Fluidstack's fleet" double-counts the same silicon. For landlord-operators this census records power and halls, and counts GPUs only where the provider owns the chips. Marketplace listings (Vast.ai's 1,400+ hosts, Shadeform, Akash) are other people's hardware and are never counted as a fleet.

The registry · part 1

The big fleets

Providers whose disclosed fleet, signed pipeline or operating footprint clears roughly 10,000 GPUs or 100 MW. ClusterMAX tier shown where rated (v2.0, November 2025).

Provider ClusterMAX GPUs (verified) Silicon Footprint Source · as of
CoreWeaveNASDAQ: CRWV Platinum 250,000+last disclosed count, Dec 2024 — not updated since; 2026 capex of $31–35B implies far more H100 → H200 → GB200/GB300 NVL72, RTX PRO 6000 43 data centers · 850 MW active · 2.2 GW+ contracted S-1 / 10-Kmar '25 / q4 '25
NscaleUK · vertical hyperscaler Unrated '25 12,600 live+ ~200,000 GB300 contracted to Microsoft (Texas 104k, Norway 52k, UK 23k, Portugal 12.6k); + 96,000 Rubin GPUs for 2027 GB300 NVL72 → Vera Rubin NVL72 Texas 240 MW → 1.2 GW · Sines PT · Loughton UK 50–90 MW · Narvik & Glomfjord NO nscale.comoct '25 / may '26
IRENNASDAQ: IREN Underperf. '25 150,000company-stated fleet after 50,000+ B300 order finishes deploying H2 2026; $9.7B Microsoft GB300 deal signed earlier H100, H200, B200 → GB300, B300 Childress TX · Mackenzie & Canal Flats BC · Prince George BC — air-cooled, renewable-rich iren.com / SECmar '26
Oracle (OCI)NASDAQ: ORCL Gold undisclosedsingle OCI Superclusters scale to 131,072 Blackwell GPUs; also 50,000 AMD MI355X (Oct 2025) H100, H200, B200, GB200/B300 + AMD MI355X 162 cloud regions built or underway · largest single site 800 MW · gigawatt nuclear site planned oracle.comsep '24 / oct '25
NebiusNASDAQ: NBIS Gold undisclosedper-site ceilings: Mäntsälä FI to 60,000 · Kansas City to 35,000 · UK 4,000–9,000 B300 H100, H200, B200, GB200, GB300 220 MW connected end-'25 → 1 GW+ secured end-'26 · Finland, Vineland NJ, UK, Iceland, Israel, Paris nebius.comoct '24 – oct '25
Crusoeprivate Gold undisclosedown cloud fleet; buildings designed for 100,000 GPUs on one fabric — Abilene racks belong to Oracle/OpenAI H100, H200, GB200 NVL72 Abilene 200 MW live · 1.2 GW campus · 4.9 GW contracted across 5 campuses dcdjul '24 / jul '26
Fluidstackprivate · NY Gold operates others'deploys & runs Anthropic's fleet (largely Google TPUs, $50B program) and Mistral-anchored French capacity NVIDIA H100/H200/GB200 + Google TPU ~1 GW named sites: River Bend LA 245 MW · Lake Mariner NY 360 MW · Abernathy & Barber Lake TX · France 1 GW anthropic.comnov '25
Lambdaprivate Silver tens of thousandsundisclosed exact; NVIDIA leases back 18,000 for $1.5B; Microsoft deal for tens of thousands GB300 NVL72; stated goal 1M+ GPUs / 3 GW H100, H200, GH200, B200, GB300 NVL72 15 US data centers · first GB300 NVL72 live Sep '25 (Mountain View) lambda.ainov '25
Lightning AImerged Voltage Park, jan '26 Bronze* 36,000+owned & operated — the largest clean private disclosure after CoreWeave; debt-free fleet; $500M+ ARR H100, B200, GB300 60 MW active · 6 facilities · 4 US states voltagepark.commar '26
Firmusaustralia · pre-IPO Silver 18,500 liveGB300s ordered & online from Apr '26 at Southgate Melbourne; 54,000 GB300 across Southgate by mid-'26; Tasmania zone to ~36,800 H200, L40S → GB300 NVL72 Tasmania 90 MW stage 1 (→ 1.6 GW national plan '28) · Melbourne · Singapore firmus.cooct '25 / apr '26
TensorWaveUS · all-AMD Silver 10,000AMD-only fleet; single 8,192 × MI325X liquid-cooled cluster is the core; MI355X ramping; 2 GW capacity secured MI325X, MI355X (ROCm; CUDA via SCALE) Arizona · Florida · Pennsylvania (+20 MW TecFusions, Jan '26) dcd / futuriomjun '26
Microsoft AzureNASDAQ: MSFT Gold undisclosed100,000+ GB300 access leased via neoclouds (Nscale, CoreWeave, Nebius, Lambda, IREN); first 4,608-GPU GB300 NVL72 cluster live Oct '25 Full NVIDIA stack + Maia silicon 400+ data centers · Fairwater AI campuses (WI, GA) press reportsoct '25
AWSNASDAQ: AMZN Silver undisclosednever discloses GPU counts; P5e/P6e-B200/GB300 families + Project Rainier (Trainium2) for Anthropic NVIDIA H100/H200/B200/GB300 + Trainium Global region footprint —no disclosure
Google CloudNASDAQ: GOOGL Silver undisclosednever discloses GPU counts; A3/A4/A4X (GB300) + TPU v5p–v7 fleets NVIDIA H100/H200/B200/GB300 + TPU Global region footprint —no disclosure
Applied Digital → ChronoScaleNASDAQ: CHRN — undisclosedcloud unit (~$75.2M TTM revenue, Aug '25) spun out as ChronoScale, May '26; parent is landlord for 400 MW CoreWeave campus H100-class clusters Ellendale ND (Polaris Forge 1–2, 600 MW leased) + colo sites applied digital IRmay '26

* Voltage Park held Silver in ClusterMAX 2.0 (Nov 2025) and Lightning AI held Bronze; the merged company (Jan 2026) has not been re-rated. IREN landed in "Underperforming" in Nov 2025 — before its Microsoft GB300 deal and 150,000-GPU expansion, a reminder that ratings lag balance sheets.

The registry · part 2

Sovereign & regional fleets

National champions and regional clouds, mostly subsidy-backed. Fleets are smaller, but disclosure is often better — governments want receipts for their money.

Provider ClusterMAX GPUs (verified) Silicon Footprint Source · as of
Yottaindia · shakti cloud Unavail. '25 16,384 liveH100s at NM1 Navi Mumbai; second 16,384 cluster planned at D1 Greater Noida for 32,768 total; B200s on the way H100, L40S → +B200 NM1 Navi Mumbai (Tier IV) · D1 Greater Noida · 700 MW campus nvidia case studyjul '26
Naver Cloudkorea Unavail. '25 60,000allocated to public cloud within Korea's 260,000-GPU national compute project Blackwell-class Korea (sovereign) semianalysisnov '25
Neysaindia · velocis Bronze ~2,000 livescaling to 20,000+ on $1.2B Blackstone-led financing (Feb '26) — would be ~⅓ of India's AI GPU capacity H100, H200, L40S, L4, MI300X Mumbai · Chennai colos · Telangana MoU with NTT DATA weka / pressfeb '26
GMI Cloudus / taiwan Bronze 7,000Blackwell GPUs at the $500M Taiwan AI DC opened Mar '26; US fleet undisclosed H100, H200, GB200 NVL72/NVL4, B300 Taiwan (own DC) + US colos taiwanplusmar '26
SoftBankjapan — undisclosedworld's first DGX B200 SuperPOD; GB200 NVL72 system; lead on Noetra national project — 27,500 Rubin GPUs with 43 partners B200, GB200 NVL72 → Rubin Japan meti / pressjul '26
Sakura Internetjapan Unavail. '25 2,000 → ~4,000Hopper GPUs; ~10,800 total planned incl. B200 at Ishikari; largest METI subsidy recipient (~¥50.1B) H100, H200 → B200 Ishikari, Hokkaido (renewable by '27) nvidia newsnov '24
GMO GPU Cloudjapan Silver undisclosedTOP500/Green500-listed H200 cluster; +256 H200 added Q4 '25; HGX B300 deployed '26; METI-subsidized (~¥1.9B) H200, B300 Tokyo gmo.jpmay '25
NeevCloudindia Bronze 8,000 ordered40,000 planned by end '26 (company statements via ClusterMAX 2.0) H100-class India semianalysisnov '25
Scalewayfrance · iliad Silver ~5,000"top-tier" GPUs per parent iliad (Feb '25); multiple 1,016-GPU H100 SuperPODs; €3B group AI plan H100, H200, GB200 Paris DC5 (OpCore) · Warsaw iliadfeb '25
Vultrus · private, 33 regions Silver undisclosedfleet size never published; GB300 NVL72 deployments via HPE announced Jun '26 NVIDIA + AMD; GB300 NVL72 33 cloud regions worldwide hpe / businesswirejun '26
RunPodus · dev cloud Bronze undisclosed"thousands of GPUs weekly" added; Q1 '26 deployments = 3× the entire prior-year fleet H100, H200, B200, B300, RTX PRO 6000 31 global regions runpod.iojun '26
The registry · part 3

The medallion long tail

Rated providers with no verified fleet disclosure. Listed so the census is complete — absence of a number is itself information.

Provider ClusterMAX What's public Silicon offered
Together AISilverFleet undisclosed; $305M Series B at $3.3B (Feb '25)H100, H200, B200, GB200
CirrascaleSilverFleet undisclosed; long-running HPC cloud, GPU-backed debt facilitiesH100, B200, MI300X
GcoreSilverFleet undisclosed; AI Cloud Stack software runs on customer estates of 20,000+ GPUsH100, H200, B200, MI300X
HyperstackBronzeFleet undisclosed; NexGen Cloud arm, EU renewable DCsH100, A100, L40
ShadeformBronzeBroker — owns no GPUs; aggregated marketplace across providersmulti-cloud catalog
STNBronzeFleet undisclosed; US-based clustersH100, H200, B200
Atlas CloudBronzeFleet undisclosedH100, H200
Prime IntellectBronzeAggregator — owns no fleet; decentralized training focusmarketplace catalog
CUDO ComputeBronzeFleet undisclosed; UK, partner-DC modelH100, H200, MI300X
QubridBronzeFleet undisclosedH100, H200
Latitude.shBronzeFleet undisclosed; bare-metal specialist, global edge sitesH100, H200, L40S
Verda (ex-DataCrunch)BronzeFleet undisclosed; Finland, EU-sovereign pricing floorH100, H200, B200
Denvr DataBronzeFleet undisclosed; Canada/US; also Intel Gaudi 3GB200, B200, MI300X, Gaudi 3
IBM CloudBronzeFleet undisclosedH100, H200, MI300X
DigitalOceanBronzeFleet undisclosed; GPU Droplets + Paperspace lineageH100, H200, MI300X, RTX 6000
Hot AisleBronzeFleet undisclosed; Michigan, AMD-focused, bare metalMI300X, MI355X
Buzz HPCBronzeFleet undisclosed; Canada, HIVE lineageH100, H200
Vast.aiBronzeOwns zero GPUs — 1,400+ independent hosts list hardware; sells them the operating systemmarketplace: RTX → B200
What it adds up to

The census totals

~500,000
deployed · disclosed

Summing only company-stated figures across neoclouds — CoreWeave, IREN, Lightning AI, Firmus, Yotta, Nscale, TensorWave, GMI, Scaleway, Neysa. Lambda, Nebius, Crusoe, Vultr and RunPod are large but undisclosed, so the true neocloud total is well past this.

~400,000+
ordered · contracted

Signed for delivery through 2027: Nscale's ~200k GB300 + 96k Rubin, IREN's 50k+ B300, Neysa's 18k expansion, Yotta's second 16.4k, Sakura's path to ~10.8k, Japan's 27.5k Rubin national order.

209
providers tracked

SemiAnalysis's ClusterMAX 2.0 market view (Nov 2025) counts 209 GPU clouds, brokers and sovereign projects — 37 earned a medallion. The long tail explains why no census can stay finished.

Two calibrations for these numbers. First, the hyperscalers: AWS, Azure and Google never disclose GPU counts — though Microsoft alone admitted to 100,000+ GB300 access just through neocloud leases, and Google sells TPUs to neoclouds. Second, the single-site record isn't a cloud at all: xAI's Colossus campus in Memphis passed half a million GPUs under one roof, more than every disclosed neocloud fleet on this page combined.

Questions this page answers

Frequently asked

Is there an official list of GPU counts per cloud?

No. SemiAnalysis tracks fleet size inside its paid models and scores it under ClusterMAX's availability criterion, but publishes no per-provider table. Public figures are scattered across SEC filings, earnings calls, company newsrooms and government subsidy announcements. This page assembles them, dated and sourced.

Which neocloud has the most GPUs?

CoreWeave — last disclosed count 250,000 (Dec 2024), certainly higher now with 43 DCs, 850 MW active and $31–35B of 2026 capex. IREN states 150,000 once its B300s finish deploying in late 2026. Nscale holds the largest signed private pipeline: ~200,000 GB300 for Microsoft plus 96,000 Rubin for 2027.

Why do Crusoe and Fluidstack show no GPU count?

Much of what they build isn't their silicon: Crusoe's Abilene racks belong to Oracle/OpenAI; Fluidstack operates Anthropic's and Mistral's clusters. A single "fleet size" would double-count customer chips. The census records their power and halls instead.

What's the difference between deployed, ordered and planned?

Deployed = racked and revenue-ready. Ordered/contracted = signed purchase with a delivery window. Planned = announced target, no confirmed hardware. Every figure here carries its class and date — a 2027 plan is not a rival's 2026 capacity.

Why are ratings shown at all?

Because fleet size and fleet quality move together in buyers' minds, and ClusterMAX (v2.0, Nov 2025) is the market's de-facto quality score. But note IREN: rated "Underperforming" in Nov 2025, a 150,000-GPU Microsoft-backed fleet by Mar 2026. Ratings lag balance sheets.

A number is stale or wrong — what then?

Send it through the corrections form with a primary source. Corrections ship within a week and the stamp date moves. Private companies: a dated, verifiable fleet figure is always welcome — on the record.

Methodology

How the census is built

Primary sources only: SEC filings (S-1, 10-K, 8-K), earnings materials, company newsrooms, named-customer press releases, and government announcements (METI subsidy awards, IndiaAI Mission, Korea's national compute project). Each row shows the figure, its class (deployed / ordered / planned), the silicon, the footprint, and the source with its date. We don't count landlords' buildings as GPU fleets, don't count marketplace listings as owned hardware, and don't repeat figures we can't trace. Verified 2 August 2026 · by Rahul Patwardhan · part of the AI Infra Ecosystem Map.